Monday, August 23, 2010
Framing Continues
Framing continues at a slow pace due to rain almost on a daily basis. It was exciting to see the second floor almost all framed out and to have stairs in place to actually walk up to it. The master bedroom is going to be awesome(see view photo) as it is going to be encased in a wall of trees having windows on all three sides. Looking at the front of the house you can imagine the fireplace flanked by two sets of french doors and the two galvanized flues rising all the way above the roofline. Looking forward to both indoor and outdoor fires later this year.
Subscribe to:
Posts (Atom)