Met with builder Mike on Saturday to go over the plans for the radiant floor heating system and snapped a couple of pictures of the work in progress. The footers have been poured and as you can see the block for the foundation is being laid. The pipes for the heating system, plumbing, and some elecctrical should go in shortly making way for the slab to be poured.