Traveled the distance to check out the progress today. The foundation has been completed and is ready for the radiant floor heating system to go in. According to the builder, this should happen next week when the special order Pex piping arrives. We met with the builder to go over the details of the heating system a couple of weeks ago. At that time, we determined that we were not only going to have to have an additional space for this system but were going to run it under the second floor rather than put radiators around those rooms. Can't wait to see how this works out. Its going to be great not having forced air heating but warm floors are going to be even better on those cold winter days.