We knew the windows were to be delivered on Friday, but did not know they would be installed by the time we got there on Saturday. It was a nice surprise. The not so nice surprise, was that the outswing windows on the second floor hit the cedar beam on the eaves before opening fully. The fix, all the second floor windows have to be taken out and lowered about 2 inches. Oh well, things happen beyond our control. While Norm says "Measure Twice, Cut Once", maybe our builder should have "Installed One, Checked For Fit, " before installing all 16 windows that now have to be lowered.