Sunday, October 17, 2010

Cedar Siding

The Board and Batten cedar siding on the top half of the house was completed this week. This is the view from the back of the house with the newly installed back door that leads out to the outdoor shower. The bottom half of the house will be galvanized corrugated siding giving the house its industrial feel. This should be installed in the next 2-3 weeks.

No comments:

Post a Comment