Saturday, July 9, 2011
Moving Along
This week a few things were completed worthy of note. 1. The reclaimed floors upstairs were installed. 2. The metal siding was installed on the front of the house and 3. Work continued on the stone floors. We were able to spend the night in the house with the windows all opened up on the second floor (albeit in a tent on the floor.) The progress is still very slow but we think the end is in sight.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment