Monday, November 28, 2011

Gas Tank On The Way



This week the gas tank is to be delivered and buried. Prior to that happening, a 6x12 ft hole 5ft deep had to be dug in the ground. That creates a lot of excess dirt. That dirt is being used to fill in around the retaining wall and level out the area in front of the outdoor fireplace and is manually being moved with a wheel barrow. We moved about 40% of it this weekend and once the tank is delivered the rest will need to be moved as well.