Its been two months since I reported that we let our builder go and that we embarked on completing the house ourselves. Over that period of time, we have hired and met many interesting contractors, shopped online for unusual building materials, and learned how to do many new things(many of which have been blogged about already). In has all finally come together and I am extremely happy to report that on Friday, December 16, the inspector came and signed off on the final inspection of the house issuing a CO(certificate of occupancy). On Saturday, we fired up the hot water and radiant floor heat, as well as the water to the house, for the first time. We were a little unsure how long it would take the house to heat up with the radiant floor heat, but by Sunday morning, the house was very comfortable and the stone floors on the main level were quite toasty. Camping has never been so good!